... are an new industry on the home layout. A big manufacturer of Barbed wire sending it westward by train. I'm using a Walthers "Allied Rail Rebuilder" and a Faller "Gantry Crane". There will also be propane unloading equipment and a storage tank on the other side of the track at the "old facility"
Showing posts with label Mill Street. Show all posts
Showing posts with label Mill Street. Show all posts
Thursday, January 28, 2016
Wednesday, April 22, 2015
Tuesday, April 21, 2015
Friday, April 10, 2015
In Place...
The first train have passed the new section :) and the GP turns around on the turntable.
The MOW-departments ballast hopper on the new track
Who stole the track? Still som work to be done.
The MOW-departments ballast hopper on the new track
Who stole the track? Still som work to be done.
Tuesday, February 24, 2015
At the Scrapyard
A short visit to the scrapyard. B. Johanson got a small yard next to the rails. There we find an old used boxcar to store reusable things.
He also have an old tankcar for storing used oil...
He also have an old tankcar for storing used oil...
Monday, January 12, 2015
MoW Progress
Pictures from MoW (Maintenance of Way) Department. The exchange of ballasting moves forward and will soon be completed on "Mill Street"-section. Gray Mainline Mix in the center and from the local Pet Store som Chinchilla gravel.
There are also some work on landscape in the adjacent section "Muddy Creek". A nice guy gave me an Noch Grass Master 2.0 for Christmas...
To the right are the example of the not so bright idea to store my freighthouse on the Muddy Creek pond some weeks :(
There are also some work on landscape in the adjacent section "Muddy Creek". A nice guy gave me an Noch Grass Master 2.0 for Christmas...
To the right are the example of the not so bright idea to store my freighthouse on the Muddy Creek pond some weeks :(
Thursday, January 1, 2015
Friday, October 17, 2014
Basement progress
A big step
forward in the basement, the Junction, a non-scenic module that make the
module setup to an out and back with the Staging Yard to the end point and
Crawford Valley and Hawks Plain in the loop
The
location are somewhere West of Chicago between the lines to Twin City and
Denver on a small branchline sometimes
used to re-route the ”big trains”
A small corner module
The Junction with a non scenic part (grey) and the closest part that will get som landscape and a bridge as scenic divider to hide the outer part of the world.
The trains are rolling. A wiew from Mill Street.
But there are still a lot work, another corner module and to connect the loop. And a lot of maintenance after more than year not running...
Wednesday, February 27, 2013
Inside...
...out. B.Fasth Warehouse got some interior to show.
A big difference compared to the beginning. I started with some Walthers Modulars and added inner walls and storeys made of styrene sheets
Next step are shelfs and racks together with som boxes and crates.
A big difference compared to the beginning. I started with some Walthers Modulars and added inner walls and storeys made of styrene sheets
Next step are shelfs and racks together with som boxes and crates.
Saturday, April 14, 2012
Trackwork
Tuesday, April 10, 2012
Easter...
Sunday, April 1, 2012
Expanding the module
First step is to expand the framework of 10mm plywood to the full lenght.

Then it´s time for the bottom of 4mm plywood

Third step is the upper frame with soundproofing styrofoam (2*10mm) inside

And todays last step is the top layer. some pieces of track show the plan, to the left a warehouse and to the right a coal dealer. The road to the left will be altered at the gate of the textile mill...

Then it´s time for the bottom of 4mm plywood

Third step is the upper frame with soundproofing styrofoam (2*10mm) inside

And todays last step is the top layer. some pieces of track show the plan, to the left a warehouse and to the right a coal dealer. The road to the left will be altered at the gate of the textile mill...
Monday, March 26, 2012
Modules and houses...
Sunday, March 25, 2012
Building buildings :)
A two week period of work created a lot of inspiration... At first a wiew along the tracks...

Mars Textile, named after my late grandfather, having an extended loading platform which will allow two boxcars to be loaded or unloaded at the same moment.

B. Fast(h) is an industrial building overlooking the yard from a small hill. Connected to this there will be an old boxcar converted to a shed down by the siding on this side.
The plan is to make a full interior that will be shown from "outside"

Mars Textile, named after my late grandfather, having an extended loading platform which will allow two boxcars to be loaded or unloaded at the same moment.

B. Fast(h) is an industrial building overlooking the yard from a small hill. Connected to this there will be an old boxcar converted to a shed down by the siding on this side.
The plan is to make a full interior that will be shown from "outside"
Thursday, September 1, 2011
Some Wood added...
Saturday, August 13, 2011
Just for fun...
The Depot section are now enough ready to make some switching (and testing). The module set have been mounted in the right place but still there are some stuffs that hasn´t been moved.
The shelf are going to be replaced by a background and som lights.
Just for fun a number of buildings and cars were placed on their right location to test the appearence
Tomorrow it's time for the missing four switch controls to get in place...
The shelf are going to be replaced by a background and som lights.
Just for fun a number of buildings and cars were placed on their right location to test the appearence
Tomorrow it's time for the missing four switch controls to get in place...
Thursday, August 11, 2011
Extra 265 West
"Mill Street" from down under. Only thing missing are the knobs on the control rods
Extra 265 West ready for switching (and testing). The tracks were really dirty and the loco need some cleaning to. And there is a BIG difference between this Atlas GP-7 and my favourite Kato NW-2. The NW is much less sensitive to dirty track...
(Click picture for larger)
Extra 265 West ready for switching (and testing). The tracks were really dirty and the loco need some cleaning to. And there is a BIG difference between this Atlas GP-7 and my favourite Kato NW-2. The NW is much less sensitive to dirty track...
(Click picture for larger)
Monday, August 8, 2011
Sunday, August 7, 2011
Trackplan Mill Street
Monday, August 2, 2010
Some paint...
Subscribe to:
Posts (Atom)































