
Then it´s time for the bottom of 4mm plywood

Third step is the upper frame with soundproofing styrofoam (2*10mm) inside

And todays last step is the top layer. some pieces of track show the plan, to the left a warehouse and to the right a coal dealer. The road to the left will be altered at the gate of the textile mill...

No comments:
Post a Comment