The new track is in place and the first train runs over the future crossing.
Showing posts with label test. Show all posts
Showing posts with label test. Show all posts
Wednesday, April 22, 2015
Friday, April 10, 2015
In Place...
The first train have passed the new section :) and the GP turns around on the turntable.
The MOW-departments ballast hopper on the new track
Who stole the track? Still som work to be done.
The MOW-departments ballast hopper on the new track
Who stole the track? Still som work to be done.
Thursday, April 9, 2015
Test...
Engine Depot section is ready for some testing. The last connections are made down under. Rods for switch control still missing. Now a short coffee brake :)
Wednesday, January 23, 2013
Results :)
... from Todays work. Team Track and loading area:
Along the tracks (with a Telephone Pole):
But a lot more to do... Clean and adjustments...
Along the tracks (with a Telephone Pole):
But a lot more to do... Clean and adjustments...
Tuesday, September 4, 2012
Monday, August 20, 2012
Wednesday, April 18, 2012
Operations...
19:06 swedish summer time... ready for some operations? The tools are ready...

Loconumber put into the Intellibox and dispatch to "FredI"

The local freight is ready

A closer wiew, "Q" GP7 265 at the front.

C&EI Boxcar with fabrics to...

... Mars Textile.

A CB&Q boxcar in LCL service to

... the freight shed.

To empty hoppers ready for some grain at...

... the elevator

Modernization goes on, two old bridges sold as scrap...

... to the scrapyard. He has to watch his old "Bucyrus"

A tankcar with diesel to the fuel dealer...

... to refill to truck on the teamtrack.

Incoming...

Stop!

The caboose clears the roadcrossing.

The the front and rear end crew take a break...

The big question, how to make switching as fast as possible?

Halfways

The last car in place

The engine at front again, the whistle blows and the "Doodlebug" arrives with the evening express...

Homewards

The "Doodlebug" on the trestle on it´s way to...

19:30 finished already, not as many picture as I had hoped but the photographer got a little to excited in running trains...
A brief description of a short test, no freightcards, but some ideas...

Loconumber put into the Intellibox and dispatch to "FredI"

The local freight is ready

A closer wiew, "Q" GP7 265 at the front.

C&EI Boxcar with fabrics to...

... Mars Textile.

A CB&Q boxcar in LCL service to

... the freight shed.

To empty hoppers ready for some grain at...

... the elevator

Modernization goes on, two old bridges sold as scrap...

... to the scrapyard. He has to watch his old "Bucyrus"

A tankcar with diesel to the fuel dealer...

... to refill to truck on the teamtrack.

Incoming...

Stop!

The caboose clears the roadcrossing.

The the front and rear end crew take a break...

The big question, how to make switching as fast as possible?

Halfways

The last car in place

The engine at front again, the whistle blows and the "Doodlebug" arrives with the evening express...

Homewards

The "Doodlebug" on the trestle on it´s way to...

19:30 finished already, not as many picture as I had hoped but the photographer got a little to excited in running trains...
A brief description of a short test, no freightcards, but some ideas...
Tuesday, November 8, 2011
Tuesday, August 16, 2011
Some tests
Saturday, August 13, 2011
Just for fun...
The Depot section are now enough ready to make some switching (and testing). The module set have been mounted in the right place but still there are some stuffs that hasn´t been moved.
The shelf are going to be replaced by a background and som lights.
Just for fun a number of buildings and cars were placed on their right location to test the appearence
Tomorrow it's time for the missing four switch controls to get in place...
The shelf are going to be replaced by a background and som lights.
Just for fun a number of buildings and cars were placed on their right location to test the appearence
Tomorrow it's time for the missing four switch controls to get in place...
Wednesday, August 4, 2010
First look...
... towards the north entry of "Crawford Valley". It´s a recycling of a former N-RE doubletrack junction. There will be the possibility of two incoming tracks and also a short industrial connection (a quarry?) to the right. Tomorrow we will take the dynamite and remove some of the old landcape
The Depot area are also showing progress with roads and the place for the freighthouse
The Depot area are also showing progress with roads and the place for the freighthouse
Sunday, January 17, 2010
Sunday, November 8, 2009
Test and trials
Monday, November 2, 2009
Tracklaying finished
Monday, October 26, 2009
Not to bad
Todays there was just some time to test the ideas and place the structures as planned.
One special is the track on the "outside" of the buildings, please notice the safety arrangement that will keep the trains on the right place despite the short distance to the edge.
Here´s also the hardboard that outlines some of the roads visible.
One special is the track on the "outside" of the buildings, please notice the safety arrangement that will keep the trains on the right place despite the short distance to the edge.
Here´s also the hardboard that outlines some of the roads visible.
Wednesday, August 19, 2009
More testing
This sunday there was a big test driving session. Most things worked out fine except the left switch on the interchange tracks. This is the only Atlas No 5 on the module, all other switches are No 7. I´ve to take a closer look to see whats wrong.
Sunday, July 26, 2009
Testing
Today it was time for some test driving. Two DC-Locos drove back and forward and tested all tracks on the module set. The picture is false because it was one loco at the time (someone, guess who, had made a bad connection). It was meant to have the possibility to disconnect the crossing line with a switch if there is a need for several DCC-boosters on a bigger module layout but that didn´t work out today.
Subscribe to:
Posts (Atom)



















