Showing posts with label South River. Show all posts
Showing posts with label South River. Show all posts

Sunday, November 6, 2011

Waiting...

...that the Sculptamold will dry...


The embankment ready to get some landscape.


In place...


First train. No, not really it's just a test how it will look.

Friday, November 4, 2011

Friday evening...

... and a short progress report. Yesterday the tracks on "South River" was laid. At the end a pair of Minitrix Rerailer was installed to make fiddling easier.


Today there have been testdriving, track cleaning, track cleaning... and at last the bridge abutments was glued in place. The bridge is recycled from an earlier layout and will hide the entrance to the staging.

Monday, October 10, 2011

From idea to shelf

As usual there been some replanning and due to the "user interface" Crawford Valley was turned 180 degrees.

The connection to the south will be "South River", a micro staging (just two tracks) that hides beyond the computer desk and make further expansion possible to a little bigger removable staging yard.

The tracks will disappears out of sight below a small bridge to the left.

Wednesday, August 10, 2011

Further plans

As usually their are plans for the expansion ;) The current goal are an "operational" small module-set in the office/workroom this autumn. The stagingyards going to be built as shelfs along the South and North walls.

Here are a proposal of "South River" with a railway bridge hiding the entrance.


"North Ridge" are a still secret (undecided) yard and industrial connection along the northern wall...