...passes through Crawford Junction.
A small test run after changing to MTL-boggies and Weighting. The most of the coal hoppers are far to light (10-12g instead of 25-30g pro NMRA). Still some work with weathering the cars inside and out...
Showing posts with label Junction. Show all posts
Showing posts with label Junction. Show all posts
Thursday, January 28, 2016
Friday, May 8, 2015
Closing the Gap!
A big day in the small world. The out and back is completed with the last small curve. In a near future will the traffic Galesburg - Crawford Valley - Crawford Junction - Savannah via be reopened.
Friday, February 27, 2015
More MoW...
... painting the track on Crawford Junction, Mainline Tamiya XF63 "German Grey", secondary Polly Scale "Dirt".
On Crawford Valley there are new sand beneath the track and in the sides of the cut
On Crawford Valley there are new sand beneath the track and in the sides of the cut
Labels:
americaN,
Construction,
Junction,
Standard,
Valley
Thursday, July 22, 2010
Long time...
Due too many other things the work on the Junction got lower priority a long time, but now it´s one the move again. One big decision been made, "Crawford Junction" (seen above) and "Crawford Valley" are now to separate module-sets but still on this blogg together.
Hopefully there will get som new grass and a lot of train running to test before the rail are painted and ballasted on the remaining
Sunday, November 8, 2009
Test and trials
Tuesday, October 13, 2009
One, two and three
Here´s some pictures showing the principle of modularity. How it´s possible for Crawford to grow and fit several spaces
One - The small one, with a short track to a freight shed. South and North End(ca 109 cm)

Two - medium size, with a short run around and an additional track to a grain elevator on the Valley(ca 218 cm)

Three - Next step, with the Junction in place but the not yet grown sideways. (ca 330 cm)

Four, five, six... are still in the imagination of the builder.
One - The small one, with a short track to a freight shed. South and North End(ca 109 cm)

Two - medium size, with a short run around and an additional track to a grain elevator on the Valley(ca 218 cm)

Three - Next step, with the Junction in place but the not yet grown sideways. (ca 330 cm)

Four, five, six... are still in the imagination of the builder.
Subscribe to:
Posts (Atom)











