Saturday, July 11, 2009
Terraforming
Terraforming has started on the southernmost part. I use a mix of plaster, glue, paint and sawdust. The plywood strip are going to be a narrow road.
Thursday, July 9, 2009
More testing
Last evening the trackwork on the third, the interchange section began. And here are a few photos from today when it was ready to test. First a wiew of the layout.
Wednesday, July 8, 2009
First real trains on Crawford Junction
After a long yesterday evening with the two sections bottom up and soldering switchmotors and track connectors. That made it possible to the first real test run of two Crawford sections today. First an overwiew from "South" or Chicago in the real world.
Ready for todays work is CB&Q 9215, a Kato NW2 with a short train.
Waiting on the interchange track is three cars from the Q
After a short trip are the cars on the interchange track for Milwaukee Road.
Ready for todays work is CB&Q 9215, a Kato NW2 with a short train.
Waiting on the interchange track is three cars from the Q
After a short trip are the cars on the interchange track for Milwaukee Road.
Tuesday, July 7, 2009
Line up
Sunday, July 5, 2009
A Tower!
Todays small works, a test - Tower Zero, to see how it will look like on the module and to see that it looks prototypical (I´ve got just one picture of the real Crawford Tower). The big change to the real model will be the windows ant to mount them much closer to the surface.
On the module it looks nice I think.
Yesterdays work, legs aren´t fun to make but necesary.
On the module it looks nice I think.
Yesterdays work, legs aren´t fun to make but necesary.
Friday, July 3, 2009
Subscribe to:
Posts (Atom)
