... some mixed building ;)
The module meeting gave a lot of inspiration... One project was a small shelf for the paperwork together with FRED and cardholders.
Next project is to build some more industries that use the teamtrack. Ma Bakers has earlier been located "of layout". A small bridge will connect to the roadcrossing right.
Showing posts with label americaN. Show all posts
Showing posts with label americaN. Show all posts
Sunday, September 27, 2015
Wednesday, March 25, 2015
Wednesday morning...
after the first morning trains has passed through and switched...
Along the station...
The operators wiev:
- First row, ready cars waiting for pickup.
- Second row, cars newly arrived, waiting for loading and unloading.
- Third row, the weeks waybills day after day, Wednesday moved and Thursday request for Empties sent.
Now we're waiting for the morning local Savannah - Galesburg to arrive...
Along the station...
The operators wiev:
- First row, ready cars waiting for pickup.
- Second row, cars newly arrived, waiting for loading and unloading.
- Third row, the weeks waybills day after day, Wednesday moved and Thursday request for Empties sent.
Now we're waiting for the morning local Savannah - Galesburg to arrive...
Monday, March 23, 2015
DreamTrack 2015
The meeting has ended. The modules are back home, i'm tired but satisfied...
First a shot before loading the car.
First a shot before loading the car.
One of my daughters was engineer for one day.
Busy in Crawford, the empty coaltrain running through at while the reefer train make a setout.
Friday, February 27, 2015
More MoW...
... painting the track on Crawford Junction, Mainline Tamiya XF63 "German Grey", secondary Polly Scale "Dirt".
On Crawford Valley there are new sand beneath the track and in the sides of the cut
On Crawford Valley there are new sand beneath the track and in the sides of the cut
Labels:
americaN,
Construction,
Junction,
Standard,
Valley
Monday, February 23, 2015
SmallWorks...
... preparing for the big meeting...
To keep the booster districts insulated I'm making small Acrylic blocks "Plexiglas" .A friend made the blocks and I'm only drilling the 4mm holes that will keep the connectors that not are in use insulated.
I've drilled four holes in worst case...
To keep the booster districts insulated I'm making small Acrylic blocks "Plexiglas" .A friend made the blocks and I'm only drilling the 4mm holes that will keep the connectors that not are in use insulated.
I've drilled four holes in worst case...
A batch of ten are ready
Tuesday, February 10, 2015
Wednesday, January 23, 2013
Static Grass mix...
... in the americaN-Norm
One part of each Heki "Sommerwiese" (3360), "Wildgras" (3367) and "Winterboden" (3363).
If you use turf (Woodland Scenic) its either "Aride":
2 parts T50 (Mischung Erdboden / earth blend) + 2 parts T43 (fein beige / yellow grass) + 1 part T44 (fein Herbst / burnt grass).
or "Humid":
2 parts T44 (fein Herbst / burnt grass) + 1 part T45 (fein Sommer / green grass) + 2 parts T50 (Mischung Erdboden/earth blend).
One part of each Heki "Sommerwiese" (3360), "Wildgras" (3367) and "Winterboden" (3363).
If you use turf (Woodland Scenic) its either "Aride":
2 parts T50 (Mischung Erdboden / earth blend) + 2 parts T43 (fein beige / yellow grass) + 1 part T44 (fein Herbst / burnt grass).
or "Humid":
2 parts T44 (fein Herbst / burnt grass) + 1 part T45 (fein Sommer / green grass) + 2 parts T50 (Mischung Erdboden/earth blend).
Subscribe to:
Posts (Atom)

