To make it some easier for an operator at Crawford Valley the switches at the entries will get powered, and all that lays in main will have its position shown.
Showing posts with label Valley. Show all posts
Showing posts with label Valley. Show all posts
Friday, January 1, 2016
Thursday, June 11, 2015
The Curve
The work on the home section "The Curve" are making some advance.
After Sculptamold and Paint. The remnants of an former branchline to the right.
Cutting trough the hill...
Close to the edge but some safety meassures taken
After Sculptamold and Paint. The remnants of an former branchline to the right.
Cutting trough the hill...
Close to the edge but some safety meassures taken
Friday, May 8, 2015
Closing the Gap!
A big day in the small world. The out and back is completed with the last small curve. In a near future will the traffic Galesburg - Crawford Valley - Crawford Junction - Savannah via be reopened.
Friday, April 10, 2015
Tuesday Morning...
... in Crawford Valley, an ordinary day. The line north is closed due to work but the traffic from south are going on. We are waiting for #221, the local from Galesburg.
Early morning.
The agent are busy at Galesburg getting the cars and cards ready. Six loads and two empties for Crawford Valley
The train below the bridge. As usual the local uses track #3.
Caboose placed along the platform to minimize movement
Roadcrossing free.
Stopped.
First move. Pickup and change the LCL-car at the freighthouse
Brown out, red in...
"Clean" track four and five for all outbound cars and empties. Put them on track three.
Split inbound for different side of yard.
Ready
Run around and switch east side, Textile factory, Scrap Yard and Farmers Co-op. Look out when passing the roadcrossing.
Some used items to the scrapyard.
A car with Fertilizer for the farmers.
After switching the teamtrack the train is ready to return to Galesburg. Four empties and seven loaded car.
Early morning.
The agent are busy at Galesburg getting the cars and cards ready. Six loads and two empties for Crawford Valley
The train below the bridge. As usual the local uses track #3.
Caboose placed along the platform to minimize movement
Roadcrossing free.
Stopped.
First move. Pickup and change the LCL-car at the freighthouse
Brown out, red in...
"Clean" track four and five for all outbound cars and empties. Put them on track three.
Split inbound for different side of yard.
Ready
Run around and switch east side, Textile factory, Scrap Yard and Farmers Co-op. Look out when passing the roadcrossing.
Some used items to the scrapyard.
A car with Fertilizer for the farmers.
After switching the teamtrack the train is ready to return to Galesburg. Four empties and seven loaded car.
In Place...
The first train have passed the new section :) and the GP turns around on the turntable.
The MOW-departments ballast hopper on the new track
Who stole the track? Still som work to be done.
The MOW-departments ballast hopper on the new track
Who stole the track? Still som work to be done.
Wednesday, March 25, 2015
Wednesday morning...
after the first morning trains has passed through and switched...
Along the station...
The operators wiev:
- First row, ready cars waiting for pickup.
- Second row, cars newly arrived, waiting for loading and unloading.
- Third row, the weeks waybills day after day, Wednesday moved and Thursday request for Empties sent.
Now we're waiting for the morning local Savannah - Galesburg to arrive...
Along the station...
The operators wiev:
- First row, ready cars waiting for pickup.
- Second row, cars newly arrived, waiting for loading and unloading.
- Third row, the weeks waybills day after day, Wednesday moved and Thursday request for Empties sent.
Now we're waiting for the morning local Savannah - Galesburg to arrive...
Monday, March 23, 2015
DreamTrack 2015
The meeting has ended. The modules are back home, i'm tired but satisfied...
First a shot before loading the car.
First a shot before loading the car.
One of my daughters was engineer for one day.
Busy in Crawford, the empty coaltrain running through at while the reefer train make a setout.
Friday, February 27, 2015
More MoW...
... painting the track on Crawford Junction, Mainline Tamiya XF63 "German Grey", secondary Polly Scale "Dirt".
On Crawford Valley there are new sand beneath the track and in the sides of the cut
On Crawford Valley there are new sand beneath the track and in the sides of the cut
Labels:
americaN,
Construction,
Junction,
Standard,
Valley
Tuesday, January 29, 2013
More Photos...
Valley Growers Elevator and a NW2 with a MoW ballast hopper.
Northways along the track.
Freighttrain with two "Q" GP7.
B.Ericson Salvage Yard with gantry crane.
Teamtrack and train.
Southways along the track.
Northways along the track.
Freighttrain with two "Q" GP7.
B.Ericson Salvage Yard with gantry crane.
Teamtrack and train.
Southways along the track.
Saturday, January 26, 2013
The Elevator...
... are one of the industries in Crawford Valley. Owned by the local farmers Co-Operation.
Here the local switcher move a boxcar during harvest season.
The Supervisor makes a visit.
The passing Freight Train stops by...
... And move again...
A wiew from the Creek...
Here the local switcher move a boxcar during harvest season.
The Supervisor makes a visit.
The passing Freight Train stops by...
... And move again...
A wiew from the Creek...
Friday, January 25, 2013
MoW...
... or Maintenance of Way. My NW 2 and a pair of ballast hopper in action.
"New" industries, a scrap dealer with his gantry crane.
"New" industries, a scrap dealer with his gantry crane.
Tuesday, September 4, 2012
Wednesday, July 20, 2011
A "new" trackplan
After a long break som new ideas have appeared to allow some more operations on the modules. The "Depot module" laying on the workbench but the "Extension" are still just an idea...

CS - Farmers Co Op Storage
E - Elevator
FD - Fuel dealer
FH - Freight house
GS - Grain storage
R - Ramp
TM - Textile Mill
TT - Teamtrack
CS - Farmers Co Op Storage
E - Elevator
FD - Fuel dealer
FH - Freight house
GS - Grain storage
R - Ramp
TM - Textile Mill
TT - Teamtrack
Wednesday, August 4, 2010
First look...
... towards the north entry of "Crawford Valley". It´s a recycling of a former N-RE doubletrack junction. There will be the possibility of two incoming tracks and also a short industrial connection (a quarry?) to the right. Tomorrow we will take the dynamite and remove some of the old landcape
The Depot area are also showing progress with roads and the place for the freighthouse
The Depot area are also showing progress with roads and the place for the freighthouse
Subscribe to:
Posts (Atom)