Some adjustment of the plan according to progress. Now Crawford Junction takes place in the loop
Showing posts with label Planning. Show all posts
Showing posts with label Planning. Show all posts
Monday, April 6, 2015
Old Engine Depot...
... at the southeast end of Crawford Valley. A new section that will bring some more space to the layout room and make it possible to turn the old Doodlebug that runs on the branchline.
To the beginning there will be just the turntable and a spur but in the future there might be a shed for the locos. At the opposite side there will be a spur to a gravel pit.
To the beginning there will be just the turntable and a spur but in the future there might be a shed for the locos. At the opposite side there will be a spur to a gravel pit.
Sunday, January 13, 2013
Monday, January 7, 2013
Sunday, January 6, 2013
Future plans...
... and drawings. An expansion towards four meters are on the way with just some small differencies against shelf layout at home. (IHRR)
Tuesday, October 30, 2012
Saturday, October 13, 2012
Replanning...
... due to the neverending story (discussions) in the modular group that in some cases follows FREMO americaN... :(
My decision is to go on my own with prototype operations on a small secondary line instead the dream of gigantic modular set up that never realizes. The result is that Crawford Valley will take a central place on my shelf layout in the future.
To be continued... :)
To be continued... :)
Wednesday, April 11, 2012
Wednesday, August 10, 2011
Further plans
As usually their are plans for the expansion ;) The current goal are an "operational" small module-set in the office/workroom this autumn. The stagingyards going to be built as shelfs along the South and North walls.
Here are a proposal of "South River" with a railway bridge hiding the entrance.
"North Ridge" are a still secret (undecided) yard and industrial connection along the northern wall...
Here are a proposal of "South River" with a railway bridge hiding the entrance.
"North Ridge" are a still secret (undecided) yard and industrial connection along the northern wall...
Labels:
North Ridge,
Planning,
South River,
Staging,
trackplan
Monday, August 8, 2011
Trackplan Muddy Creek
Sunday, August 7, 2011
Trackplan Mill Street
Wednesday, July 28, 2010
Schematic trackplan
CS - Farmers Co Op Storage
E - Elevator
FD - Fuel dealer
FH - Freight house
GS - Grain storage
R - Ramp
TM - Textile Mill
TT - Teamtrack
The Extension section is not yet started
Labels:
Mill Street,
Muddy Creek,
Planning,
trackplan,
Valley
Tuesday, October 13, 2009
One, two and three
Here´s some pictures showing the principle of modularity. How it´s possible for Crawford to grow and fit several spaces
One - The small one, with a short track to a freight shed. South and North End(ca 109 cm)

Two - medium size, with a short run around and an additional track to a grain elevator on the Valley(ca 218 cm)

Three - Next step, with the Junction in place but the not yet grown sideways. (ca 330 cm)

Four, five, six... are still in the imagination of the builder.
One - The small one, with a short track to a freight shed. South and North End(ca 109 cm)
Two - medium size, with a short run around and an additional track to a grain elevator on the Valley(ca 218 cm)
Three - Next step, with the Junction in place but the not yet grown sideways. (ca 330 cm)
Four, five, six... are still in the imagination of the builder.
Thursday, July 23, 2009
Sunday, May 31, 2009
Why this blogg?
In this blog i will try to show the creation of the america-n module "Crawford Junction"

Why building Crawford Junction, is a hard question to answer, one is that was the right prototype at the right moment. When we started to discus a swedish us-module railroading group i´ve already seen pictures from the prototype i chosen on the www and looked closer on by using google maps just maked me more convinced what i want to build.
The updated sketch of the moduleset. Chicago at the left and St Paul at the right
Subscribe to:
Posts (Atom)
