Crawford Valley are going to be a bit larger. A new approach from "Galesburg" has been built which connects in a better way with the gravel pit.
A excavators have done their job ;)
The new end rebuild from an old shelf connection
And beyond with switchmotor.
A look from the bridge
Tuesday, December 29, 2015
Wednesday, October 7, 2015
Tuesday, September 29, 2015
Operation tip
A way to make the operation session a lot easier for the guests are to pu small photos of the freight customers onthe cardboxes
Crawford northwest
Southeast
Crawford northwest
Southeast
Further there will be the name on the front of the box.
Monday, September 28, 2015
Ma Baker's Juice & Soda...
... is a small industry along the railway in Crawford.
The building and factory is totally freelance :)
First sketches:
A first wiew
The building and factory is totally freelance :)
First sketches:
A first wiew
Sunday, September 27, 2015
Shelf and Industries...
... some mixed building ;)
The module meeting gave a lot of inspiration... One project was a small shelf for the paperwork together with FRED and cardholders.
Next project is to build some more industries that use the teamtrack. Ma Bakers has earlier been located "of layout". A small bridge will connect to the roadcrossing right.
The module meeting gave a lot of inspiration... One project was a small shelf for the paperwork together with FRED and cardholders.
Next project is to build some more industries that use the teamtrack. Ma Bakers has earlier been located "of layout". A small bridge will connect to the roadcrossing right.
Sunday, August 30, 2015
More background
Next step on the background work are to make Crawford deeper. Here first the skypainted start with only som sketches of the details.
After a morning with som paint and brushes but still a lot to make. A small height with some trees behind the elevator.
A wiew across the yard along the Chicago road. Almost hidden behind Valley Growers Shed are Jensen Motor with it's small garage.
After a morning with som paint and brushes but still a lot to make. A small height with some trees behind the elevator.
A wiew across the yard along the Chicago road. Almost hidden behind Valley Growers Shed are Jensen Motor with it's small garage.
Friday, August 28, 2015
Friday in August, part two.
A brief wiew of the handles i use to run the trains with. Fred, FredI and Daisy
The River Zephyr, train no 11, passing the gravel pit.
Stopped at Crawford.
Picking up speed around the pond.
Passing Crawford Junction Tower
Train 302 ready to depart staging (Savannah). Two old boxcars for the feedmill.
Train 51 awaits the local in Crawford
Train 302 switching the feedmill.
Train 51 departure directly when 302 arrives.
Train 302 pick up the ready cars.
Train 12, the southbound River Zephyr arriving.
At last makes the Doodlebug a trip west and home again.
That was some train running an ordinary friday somewhere West.
The River Zephyr, train no 11, passing the gravel pit.
Stopped at Crawford.
Picking up speed around the pond.
Passing Crawford Junction Tower
Train 302 ready to depart staging (Savannah). Two old boxcars for the feedmill.
Train 51 awaits the local in Crawford
Train 302 switching the feedmill.
Train 51 departure directly when 302 arrives.
Train 302 pick up the ready cars.
Train 12, the southbound River Zephyr arriving.
At last makes the Doodlebug a trip west and home again.
That was some train running an ordinary friday somewhere West.
A Friday in August, part 1
Some photos from a day of operation.
At first, the real simple Timetable, a few lines and numbers on a paper
Preparation, the blue tab is a reminder of cars that will be moved to other customers in Crawford.
On the staging, from left train no 52, 11 (the River Zephyr) and 301, the local freight.
First to roll, train 191, a Doodlebug that will run westwards...
At the depot
Turned far far west ;) and renumbered to 192 at the junction.
Back at Crawford hidden by train 52, the morning school and work train
Back at the turntable
Train 301, the local freight has arrived an uncoupled some cars.
Sort out the cars for the east and west side customers.
Teamtrack at the West side of the yard.
Putting the LCL at the freighthouse. Switching place with the green which will be picked up at the return trip.
Switching the east side, "Kowal Steel Mfg", "Mars Textile" and the Scrapyard
Passing the Feed Mill that will be worked on the return.
To be continued by the afternoon session...
At first, the real simple Timetable, a few lines and numbers on a paper
Preparation, the blue tab is a reminder of cars that will be moved to other customers in Crawford.
On the staging, from left train no 52, 11 (the River Zephyr) and 301, the local freight.
First to roll, train 191, a Doodlebug that will run westwards...
At the depot
Turned far far west ;) and renumbered to 192 at the junction.
Back at Crawford hidden by train 52, the morning school and work train
Back at the turntable
Train 301, the local freight has arrived an uncoupled some cars.
Sort out the cars for the east and west side customers.
Teamtrack at the West side of the yard.
Putting the LCL at the freighthouse. Switching place with the green which will be picked up at the return trip.
Switching the east side, "Kowal Steel Mfg", "Mars Textile" and the Scrapyard
Passing the Feed Mill that will be worked on the return.
To be continued by the afternoon session...
Thursday, August 27, 2015
Turntable
To improve operation possibilities Crawford got one more section. A turntable with the remainings of the long gone locoshed. Att the opposite side there is a siding to the gravel pit.
In some cases people says DCC make's it simpler...
In some cases people says DCC make's it simpler...
Thursday, June 11, 2015
The Curve
The work on the home section "The Curve" are making some advance.
After Sculptamold and Paint. The remnants of an former branchline to the right.
Cutting trough the hill...
Close to the edge but some safety meassures taken
After Sculptamold and Paint. The remnants of an former branchline to the right.
Cutting trough the hill...
Close to the edge but some safety meassures taken
Wednesday, June 10, 2015
Doodlebugs
A meeting between two Doodlebugs after finishing decoder conversion and general overhaul on Per J:s (GN).
Subscribe to:
Posts (Atom)