Sunday, December 27, 2009

Roadworks

Among Father Christmas and swedish meetballs there been some small works on the modules. The road that cross the module was this evenings project.


A sheet of 0,75mm styrene was cut in a 4cm slice and scored with a knife in "concrete slabs"




A quick trip to the paintbox and primer and tomorrow it will be glued in place (hopefully)